DUKHAN HIGHWAY | QATAR

Project Overview
Located in Doha
9 Km two lane dual carriageway
Two surface bridges supported by piers
13 utility disciplines (Drainage network, Water network, Electrical
network,Doha Street surveillance system etc..)
BIM Scope of Service
MTOs extraction
BOQs development per QS standards
Support | Shop Drawings development
Support procurement operations | Payment Certificates
Design Coordination & Clash Detection
High Quality Presentations

Key Figures
Cost : $230 million
Road Length: 9 Km
Started in April 2011
Planned to be finished in March 2014
Total BIM engineers: 2

Brief Description 

As part of the Expressway Programme the Dukhan Highway East project runs around 12.6 km from the Bani Hajer Interchange (west) to the Tilted Interchange (east), and along Al Gharrafa Road from Al Rayyan Street (south) to Thani Bin Jasim Street (north). 

Benefits

The Dukhan Highway East project, as part of the Expressway Programme, runs 12.6 km from the Bani Hajer Interchange (west) to the Tilted Interchange (east), and along Al Gharrafa Road from Al Rayyan Street (south) to Thani Bin Jasim Street (north).

The mainline for Dukhan Highway East consists of eight lanes (four lanes in each direction, separated by a median) with service roads and auxiliary lanes along sections of the road. Three grade separated interchanges will also be constructed along.

Al Gharrafa Road will be reconstructed to eight lanes (four lanes in each direction, separated by a median) with service roads. There will be two grade separated interchanges along Al Gharrafa Road, as well as the underpass at the Tilted Interchange. The project will also feature various significant infrastructure works.

Project Information

AreaMultiple Areas
SectorExpressway Programme Projects
Total CostIn progress.
StatusIn progress
TypeRoads
Start Date01 October 2011
Expected completion dateFirst quarter of 2020