F-RING ROAD PROJECT | QATAR

Project Overview

Located in Doha
15 Km four lane dual carriageway
Three grade separated interchanges
15 Km of pigmented cycle track
40 km of service & temporary roads
Relocation and provision of new utilittelephone and TSE)
Attenuation tanks and substations

BIM Scope of Service

MTOs extraction
BOQs development per QS stand
Support | Shop Drawings develo
Design Coordination & Clash Det
High Quality Presentations

Key Figures
Cost : $370 million
Road Length: 66 Km
Started in April 2011
Finished at Fourth quarter of 2014

Project Overview

Located in Doha
15 Km four lane dual carriageway
Three grade separated interchanges
15 Km of pigmented cycle track
40 km of service & temporary roads
Relocation and provision of new utilittelephone and TSE)
Attenuation tanks and substations

BIM Scope of Service

MTOs extraction
BOQs development per QS stand
Support | Shop Drawings develo
Design Coordination & Clash Det
High Quality Presentations

Key Figures
Cost : $370 million
Road Length: 66 Km
Started in April 2011
Planned to be finished in April 2014
Total BIM engineers: 2

Brief Description 

The F-Ring Road is part of the Expressway Programme and is a new road between Rawdat Al Khail Street and Al Matar Street providing access to the new Doha International Airport and a direct link to the south side of Doha. The project includes the construction of a new 8.7 km expressway comprising of six to eight lanes (three to four in each direction) divided by a median with ramps and service roads at the Intersections. There are two interchanges; Al Matar Street and Najma Street Extension with bridges to be constructed. Local traffic movement is catered through two-lane frontage roads adjacent to the main carriageway. 

Benefits

The F-Ring Road is a new 7.2 km road that will become a vital connection to the south side of Doha. The new road provides a strategic link to and from the new Doha International Airport and the new Industrial Area. It will provide the missing link between Musaimeer Street and the main road leading to Al Wakra. 

Project Information

AreaMultiple Areas
SectorExpressway Programme Projects
Total Cost837,000,000 Q.R.
StatusComplete
TypeRoads
Start Date01 April 2011
Completion dateFourth quarter of 2014
837,000,000 Q.R

Cost

Roads

Sector

66 Km

Road Length