Contractual, Quantity Surveying

  • Project scope development and management
  • Develop BOQs based on CSI coding or any other coding required by the client
  • Develop summarized and detailed Material Take-Offs (MTOs) per BOQ (Bill of Quantity) aggregated on any Work Breakdown Structure (WBS) level for planning and scope of work definition
  • Develop Material Take-off reports per BOQ per object (coded as per the unique project object coding system) to link the 3D BIM other project controls system
  • Develop and implement a 3D BIM based Quantity Surveying (QS) system with automatically generated valuation sheets
  • Support procurement operations
  • Change Management Support