Contractual, Quantity Surveying and Material Take-off

  • Project scope development and management
  • Develop BOQs based on CSI coding or any other coding required by the client
  • Develop summarized and detailed Material Take-Offs (MTOs) per BOQ (Bill of Quantity)
    aggregated on any Work Breakdown Structure (WBS) level for planning and scope of
    work definition
  • Develop Material Take-off reports per BOQ per object (coded as per the unique
    project object coding system) to link the 3D BIM other project controls system
  • Develop and implement a 3D BIM based Quantity Surveying (QS) system with
    automatically generated valuation sheets
  • Support procurement operations
  • Change Management Support